家居用品Product
您现在的位置:首页 > 家居用品建筑阀门—手动操作的铜合金以及不锈钢球阀 — 测试以及要求
EN 13828:2003 Building valves- Manually operated copper alloy and stainless steel ball valves for potable water supply in buildings - Tests and requirements
EN 13828:2003 Building valves- Manually operated copper alloy and stainless steel ball valves for potable water supply in buildings - Tests and requirements | ||||
建筑阀门—手动操作的铜合金以及不锈钢球阀 — 测试以及要求 | ||||
Scope | This European standard applies primarily to copper alloy ball valves, dimensions DN 8 to DN 100, for potable water supply in buildings up to PN 10 and a distribution temperature of 65 °C. Occasional excursions up to 90 °C are permitted for a period of 1 h maximum. | |||
标准适用范围 | / | |||
Clause | Test Items | |||
Remark | ||||
5 | Design requirements | |||
5.1 | Material | |||
5.2 | End connections | |||
5.3 | Operation | |||
5.4 | Stops | |||
5.5 | Ball bore | |||
7.1 | Operating torque test | |||
7.2 | Torque and bending test | |||
7.3 | Stops and spindle- Mechanical resistance test | |||
7.4 | Hydraulic tests | |||
7.5 | Acoustic characteristics | |||
7.6 | Endurance test | |||
7.7 | Angular seal | |||
8 | Marking | |||
Sampling Requirement: 6 sets of completed products with assembly instruction (if applicable) | ||||
样品要求: 全套样品6套并包含安装说明书(如适用) | ||||
Turnaround time: Normal (30working days) | ||||
所需时间:普通30个工作日 |
样品图片: